Projects

A brief list of past projects and clients.

For references, please contact us.

Oakland University

Oakland County, MI

  • Campus of approx. 3 million square feet
  • Metering system has 140 electric, BTU, and gas meters throughout the campus used for billing departments

Restoring system operation, repairing, and re-commissioning meters for the entire metering system, which is connected to the campus building automation system

United Parcel Service

New Lighting in all Detroit Metro buildings: 1 million+ square feet

UPS Toledo Hub: 350,000 square feet

Bloomfield Schools

Oakland County, MI

Commissioning of new building with heat pump system

Eaton Rapids Schools

Eaton Rapids, MI

Developed a Strategic Energy Plan for ERPC:

  1. Conducted energy audits for 8 buildings totaling over 600,000 square feet, including lighting, energy cost, boiler and heating systems, ventilation systems, energy management systems including automated HVAC and lighting controls
  2. Developed project cost analyses, and an energy model for the district, including calculated savings from energy-related upgrades
  3. Reviewed renewable energy options
  4. Reviewed options for financing and implementation

Oakland ISD

Oakland County, MI

Energy Consultant:

  1. Re-commissioning of existing Administration Building
  2. Pre-commissioning and consulting services for new construction of four Tech Center campuses
  3. Providing energy-consulting services for other Oakland County school districts

Haslett Schools 

Haslett, MI

Designed and managed the installation of:

  1. The District-wide EMS for 8 buildings (System Integration) totaling approximately 600,000 square feet
  2. Upgrade of T8 lighting systems in 8 buildings,
  3. Conversion of HVAC units to DDC
  4. Installation of variable speed motors and building occupancy-determined control

Project Cost: $500,000

Estimated Savings: >$100,000

Ingham ISD

Mason, MI

Designed and managed the installation of

  1. The District-wide EMS for 3 buildings (Alerton System) totaling approximately 300,000 square feet
  2. New boilers in 2 buildings
  3. Upgrade of T8 lighting systems in 3 buildings

Project Cost: $600,000

Estimated Savings: >$150,000

St. Johns Schools

St. Johns, MI

Designed and managed the installation of:

  1. The District-wide EMS for 10 buildings (Siemens System) totaling approximately 600,000 square feet
  2. New boilers in the High School and 4 elementary schools
  3. Installing new transformer at the Middle School and upgrading to Primary Rate, 4) Retrofitting entire District to T8 lighting system

Financing: Michigan Energy Bonds

Project Cost: $1,100,000

Estimated Savings: >$150,000

Okemos Public Schools 

Okemos, MI

Designed and managed the installation of:

  1. The District-wide EMS for 10 buildings (Trane Summit System) totaling approximately 1 million square feet,
  2. Retrofit of entire District to T8 lighting system,
  3. Converting two schools from steam to hot water heating and installation of new boilers.

Financing: Michigan Energy Bonds

Project Cost: $2,512,736

Estimated Savings: >$500,000